    SAP PP

    Introduction to ERP
    – ERP Packages
    – Introduction to SAP
    – SAP Logistics Cycle SD/MM/PP
    – PP Flow and Procurement Types

    SAP Navigation
    Organizational structure of an Enterprise in the SAP R/3 System
    – Company, Company code, Controlling Area, Plant, Storage Location, Purchase Organization, Purchasing group, Sales Organization, Distribution Channel, Division, Sales Office, Sales Group, Shipping Point Etc…
    – Discussion on implementation approach ECC vs S/4 HANA
    – Discussion on Tools used in implementations
    – Discussion Documentation process in S/4 Hana implementation
    – Discussion on Cutover activity

    Configuration Discrete Industry

    Master data Configuration of BOM, Work center and Routings

    Shopfloor configurations –

    • Order types
    • Order type dep parameters
    • Confirmation parameters
    • Scheduling parameters
    • Production scheduling profile
    • Production scheduler
    • Availability check

    Master Data – Discrete Industry

    • Material Master
    • Bill of Material BOM
    • Work Center
    • Routing Different types of Routing
    • Production Version

    Configuration  Process Industry

    Master data  Configuration of BOM, Work center and Master Recipe.

    Shopfloor configurations –

    • Order types
    • Order type dep parameters
    • Confirmation parameters
    • Scheduling parameters
    • Production scheduling profile
    • Production scheduler
    • Availability check

    Master Data Process Industry

    • Material Master
    • Bill of Material  BOM
    • Resources
    • Master Recipe (w/o PI sheets)
    • Production Version

    Master Data  REM Industry

    • Material Master
    • REM profile  configuration
    • Product cost collector (PCC)
    • Bill of Material  BOM
    • Work center
    • Production Version

    Independent Requirement Planning

    • Demand Planning
    • Creation of PIR (Planned independent requirements)

    MRP Planning

    • Master Data requirements in MRP
    • Carrying MRP Procedure MRP, MPS, CBP
      1. Reorder Point Planning
      2. Forecast Based Planning
      3. Independent requirement Planning
      5. MPS Planning
    • Difference between MRP Vs MPS
    • Master Production Scheduling planning run (MPS RUN)
    • MRP Run In Background job

    Conversions and Processing Orders execution

    • Processing Planned orders
    • Planned orders conversion to Production Orders, Purchase Requisitions, Process Orders
    • Production order Goods issue process  (With and without Backflushing)
    • Production Orders Confirmations (with and without Auto Goods receipt)
    • Production Orders Settlement
    • Technically Complete Production Orders  TECO
    • Collective conversion of Planned Orders into Production Orders
    • Collective conversion of Planned Orders into Purchase Requisitions
    • Collective Release of Production Orders
    • Collective Confirmation of Production Order

    Goods Movement in PP

    • Goods Receipt wref to Production Order
    • Goods Receipt w/o Production Order
    • Goods Issue wref to Production Order
    • Automatic Creation of GR and Release of the Production Order
    • Creation of GI wref to Reservation

    Batch Management

    • Characteristics, Class and Sort Sequence
    • SLED In Batch in PP
    • Condition Tables
    • Access Sequence
    • Strategy Types
    • PP Batch Search Procedure
    • Maintain Batch Search Procedure for the Order Type
    • Production orders creation using Batch Automatic Batch Display at Production order creation and Production order Release
    • Batch Determination  Configuration and master data
    • Batch Derivation process Configuration and master data LIFO, FIFO, FEFO

    Strategy Group

    • Define Strategy
    • Define Strategy Group, 10, 11, 40, 20, 50
    • Assign MRP Group to Strategy Group
    • Process Flow for each Strategy Group
    • Detailed Process Flow for each Strategy Group

    Discrete /Process Manufacturing Process

    • Make To Order Cycle – MTO Process, 20, 50
    • Make To Stock Cycle – MTS Process, 10, 11, 40
    • Costing of the Materials
    • Planned cost vs actual cost in Prod/Process orders
    • Subcontracting process Operation subcontracting
    • Subcontracting process  Header subcontracting with special procurement key

    Availability in MRP in PP

    • Define Requirement Classes and Requirement Types
    • Define Checking Rule and Availability Check

    Repetitive Manufacturing Process

    • Master Data Maintenance
    • Production versions
    • REM Profile
    • Backflusing
    • REM Back flushing

    INTEGRATION OF PP WITH OTHER MODULES

    • MM
    • SD
    • QM
    • FI
    • CO

    Configurations for Demo: